.

Scallop Dredging Application

scallop dredging

Applications for scallop dredging permits for the 2019/2020 season are invited from vessels meeting the following criteria:

Maximum overall length of 12m and 221KW engine power

Vessels which have previously notified a valid track record to the authority and do not exceed 18.3m overall length and 400KW engine power.

Please Note: A maximum of three permits are available for the 2019/2020 season.

You can view the application form and details of the permit allocation below:

Procedure for NEIFCA Scallop Dredging Permit Allocation (pdf 124kb)

Application for Permit to Dredge for Scallops (pdf 100kb)

Applications can be submitted by email to:

ne-ifca@eastriding.gov.uk 
or 
post to: 

NEIFCA
Town Hall
Quay Road
Bridlington
YO16 4LP

Deadline for applications is 26 July 2019